Translate

Saturday, 28 January 2017

Building Martian sewers/Jan's Blog 2017

As you can see the construction is taking longer than I had hoped. The excellent set from Ainsty Castings  is produced in resin and there is some distortion in the moulds. This makes and easy fit with the others pieces rather difficult. So it's a case of sanding,filling and even sawing before the final gluing.

So far I've three large boards and one smaller. The aim being that I can play at least three sewer levels while making enough of walls removal to give different options while still maintaining a skeleton to give support to the pieces.


I'm hoping I'll get the painting finish before the end of Feb?